Background
Abbeville Area Medical Center was in need of adding a new MRI unit to its existing facility. Due to limited space and the need for a permanent location for their new MRI machine, Abbeville Area Medical Center believed that a modular unit would be more cost-efficient, as opposed to a mobile unit.
The Challenge
The design had to maintain a cohesive architectural aesthetic with the existing campus, the placement had to fit within the available footprint, and the construction had to be carried out in a manner that did not disrupt daily medical operations.
Why Work With Mobile Modular
AMC selected our team because of their experience and proposed solution, which included a single modular building to house the MRI with a connection to an existing walkway integrating the addition to the medical center. Mobile Modular partnered with Canon Medical Systems to help the hospital finance the project for its new MRI unit.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!
The Solutions
With a brick exterior, the modular building blends effortlessly into the overall medical center. Modular construction proved to be an effective solution because not only did it minimize operational disruption, but it also allowed site work to progress concurrently with the fabrication of the modular unit, thereby reducing the project schedule.