Mobile Modular Created a New Charter School Under an Aggressive Timeline

Background

For years work was being done to open a new charter school in Clayton County, Georgia. When the charter was finally approved in September and then zoning needed for the new facilities approved in November, the DuBois Integrity Academy in Riverdale, Georgia was looking to have their doors open by the next school year.


The Challenge

To build a facility that would accommodate all of their projected students in this time frame, they needed a solution that would both meet their budget and timeline, as well as projected growth. The overall project design then went through multiple iterations, with a budget that was both driven by the anticipated student count and limited due to a site that required significant grading work to become suitable for use as an educational facility.

The Solution

The DuBois Integrity Academy ultimately chose to utilize modular construction through Mobile Modular to complete the school on an aggressive timeline. The innovative Phase One design of the DuBois Integrity Academy consisted of a 25,000 SF permanently installed building that housed approximately 400 students. To accommodate future growth, the building was engineered to have the ability to add a modular second-floor addition to help minimize the initial construction cost.

Phase One

The Phase One building was constructed with two wings and a site-built common area that is utilized as a cafeteria and assembly space. This phase contained 17 classrooms and an administration area with offices, a conference room, and an open reception area as well as a nurse’s station, a common area with a warming kitchen, restrooms, and a teacher’s workroom. The exterior of the building consists of brick wainscot with Hardie plank siding and an exterior lightning protection system.

Phase Two

In just one year, enrollment continued to grow, and the planned Phase Two build-out took place in 2016. Our team added a second floor for grades three to five, creating an additional 12,300 SF with 11 classrooms, stairwells, and an elevator to the existing structure.

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

DUBOIS INTEGRITY ACADEMY

Customer

Customer Name: DuBois Integrity Academy

Project Location

Project Location: Riverdale, GA

Building Type

Building Type(s): Modular Classroom

Total Area

Total Sq. Ft: 37,300 sq.ft

New or Used

New or Used Building: New

Job Type

Job Type: Sale

Permanent Charter School 1
Permanent Charter School 2
Permanent Charter School 3
Permanent Charter School 4
Permanent Charter School 5

*Click on the image to see the full-size view!

Back to top