Modular Stem School Expansion
PROJECT PROFILE
Project Partners: Genesee STEM Academy
Building Use: 14 Modular Classrooms, Restrooms
Time: 120 days
Download Case StudyMobile Modular Provided a Modular Office On Time and Under Budget
Background
The growing Genesee STEM Academy needed a temporary and permanent modular solution to accommodate the influx of student enrollment for the upcoming school year.
The Solution
With only a few months to get this done, Mobile Modular was able to provide a temporary solution from our available fleet classrooms as well as complete the design, engineering, and manufacturing of the permanent 14-classroom addition in one semester.
The new addition featured spacious-sized classrooms at 27’x30’ including science and technology classrooms with full restroom facilities for over 200 students and staff. Mobile Modular also provided the on-site construction of the site connecting the link to adjoin the existing school to the new addition.
Why Call Mobile Modular?
Mobile Modular was hired as the Turnkey General Contractor to handle Everything from the design, engineering, manufacturing, foundations, site-built connecting link to the existing school, exterior and interior completion along with site finish work.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!
Genesee Stem Academy
Customer Name: Genesee STEM Academy
Project Location: Flint, MI
Building Type(s): Education – Permanent Classroom Addition and Temporary Classrooms during construction
Module Count: 14 modules (14’x66’ each)
Total Sq. Ft: 12,000 sq. ft.
Days to Complete: 120 Days