Modular Student Dorm
PROJECT PROFILE
Project Partners: Sequel Transition Academy
Building Use: Modular Dormitory
Time: 3 months
Download Case StudyMobile Modular Provides an Affordable and Quick Solution for Modular Dorms
Background
Sequel Transition Academy was in need of a facility to accommodate the tremendous growth the Sioux Falls location has been experiencing.
The Challenge
Before turning to Mobile Modular, Sequel was having a hard time finding the right solution that was not only feasible but could be built in the quick time frame they needed.
The Solution
Mobile Modular was able to secure an existing modular dorm facility located in Houston, Texas and with some upgrades to the building from Texas to South Dakota codes as well as some hurdles to overcome with transporting these very large and heavy modules, the new 17 module, 12,045 square foot building was finally set out in early December 2017.
The Mobile Modular team completed the project on schedule in March 2018.
Why Call Mobile Modular
By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!