Disaster Relief Temporary Classrooms

PROJECT PROFILE


Project Partners: Terrebonne School District

Building Use: Temporary Classrooms for Disaster Relief

Time: 6 months

Download Case Study

Mobile Modular Came to the Rescue with Temporary Space to Get Students Back in Class

Background

Terrebonne Parish School District had two school campuses completely destroyed during Hurricane Ida. They needed temporary space quickly to get the students back in class and relieve overcrowding at other buildings within the district.


The Challenge

Mobile Modular was awarded the job of designing and building two entire high school campuses for South Terrebonne High School and Ellender Memorial High School.

The Challenge

Mobile Modular was able to design and install 172 floors across both locations within 6 months of receiving the contract. Each new school’s new buildings include all the necessary classrooms, plus 4 working kitchens for home economics, 2 science labs, a library, a cafeteria, changing rooms for physical education, separate band/music buildings, and each with gang and private restrooms.

The buildings were finished in early August in time to welcome the students back for the new year!

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

TERREBONNE SCHOOL DISTRICT

Customer

Customer Name: Terrebonne School District

Project Location

Project Location: Bourg, LA; Houma, LA

Building Type

Building Type(s): Modular Classroom

Total Area

Total Sq. Ft: 100,000+ sq. ft.

Module Count

Module Count: 172

Permanent or Temporary

Permanent or Temporary: Temporary


      Disaster Relief Temporary Classrooms
     1

      Disaster Relief Temporary Classrooms
     2

      Disaster Relief Temporary Classrooms
     3

      Disaster Relief Temporary Classrooms
     4

      Disaster Relief Temporary Classrooms
     5

      Disaster Relief Temporary Classrooms
     6

      Disaster Relief Temporary Classrooms
     7

      Disaster Relief Temporary Classrooms
     8

      Disaster Relief Temporary Classrooms
     9

      Disaster Relief Temporary Classrooms
     10

      Disaster Relief Temporary Classrooms
     11

      Disaster Relief Temporary Classrooms
     12

      Disaster Relief Temporary Classrooms
     13

      Disaster Relief Temporary Classrooms
     14

      Disaster Relief Temporary Classrooms
     15

*Click on the image to see the full-size view!

Back to top